The verdict in three sentences
For a rooftop solar developer in Singapore, the corporate website has to convince a facilities director or a REIT asset manager that your installed portfolio performs and that the savings, or the PPA rate, are credible before a site survey. Expect 30,000 to 55,000 SGD as a 2026 market ballpark, over 10 to 14 weeks, with the savings calculator and the project map driving most of the spread. A single 500 kWp rooftop deal closed through the site pays for it several times over.
Who you are really writing for
Your buyers are logistics operators in Tuas, manufacturers in Jurong, data centre and mall owners, plus the lenders and investors behind PPA portfolios. Most of them compare a solar lease or PPA against their current retail electricity contract, so they want three numbers fast: expected generation, savings or PPA tariff versus grid, and contract length. The website also needs to speak to the SolarNova and Green Mark context that many building owners already know.
| Brief component | Audience | Priority |
|---|---|---|
| Project map (kWp, year, sector, roof type) | Investors, building owners | Essential |
| Savings or PPA calculator from monthly bill | Facilities and finance directors | Essential |
| Case pages with measured yield | Lenders, REITs | High |
| O&M and remote monitoring page | Industrial clients | High |
| Sustainability reporting support (carbon avoided) | Listed companies | High |
| Document hub (certifications, insurance) | Procurement teams | Medium |
| Feasibility request with bill upload | All | Essential |
Budget breakdown in SGD
Calculator depth drives cost. A simple version multiplies roof area by an average yield and a tariff; an advanced one handles load profiles, export, PPA versus capex and carbon reporting outputs.
| Workstream | Core scope | Full scope |
|---|---|---|
| Discovery, sitemap, messaging | 3,500 SGD | 5,500 SGD |
| Custom design | 6,000 SGD | 9,500 SGD |
| Build and CMS | 9,000 SGD | 15,000 SGD |
| Interactive project map | 4,000 SGD | 7,000 SGD |
| Savings and PPA calculator | 5,000 SGD | 13,000 SGD |
| PDPA-compliant forms and consent | 1,000 SGD | 2,000 SGD |
| QA, launch, technical SEO | 1,500 SGD | 3,000 SGD |
| Indicative total | 30,000 SGD | 55,000 SGD |
Managed hosting and a care plan from a Singapore agency usually run 400 to 900 SGD a month (2026 estimate). As a nearshore option, Kolonell's prices are 3,050 to 5,340 EUR for a Premium site and 3,810 to 6,100 EUR for a simple custom application (2,500,000 to 4,000,000 FCFA) if the calculator becomes a real pre-feasibility tool, with Standard maintenance at 114 EUR a month.
Writing a brief that gets accurate quotes
Keep it to 8 to 12 pages. State measurable goals (for example 12 qualified feasibility requests a month), the page list, the project record model (kWp, panel and inverter brands, annual yield, client sector), calculator rules signed off by your engineering lead, and who owns content updates.
On data protection, bill uploads and contact forms fall under the Personal Data Protection Act. Collect only what you need, state the purpose clearly, obtain consent for marketing follow-up, and define how long you keep uploaded bills. Name your data protection officer contact, as the PDPC expects organisations to make one available. For calculator outputs, always show a range and the assumptions (irradiance, tariff, self-consumption share) to avoid overpromising.
Mini case study
Illustrative example: Wei Ling, CEO of a 40-person rooftop solar developer in Singapore, spends 42,000 SGD on the site plus 650 SGD a month, 49,800 SGD in year one. A typical deal is a 500 kWp PPA with a lifetime gross margin of around 120,000 SGD.
Need a professional website?
Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.
The site brings in 10 feasibility requests a month and 1 in 15 converts, about 8 deals a year. Even if only 2 of those are truly website-driven, that is 240,000 SGD of margin, close to five times the first-year cost.
FAQ
What does a solar company website cost in Singapore?
Roughly 30,000 to 55,000 SGD in 2026 for a custom build. The calculator and project map typically account for 30 to 35 % of the budget.
How precise should the savings calculator be?
Precise enough to qualify, honest enough to protect your reputation. A range within about 15 % with visible assumptions works, and the site survey refines it.
Do we need consent to keep uploaded electricity bills?
Under the PDPA you must notify the purpose and obtain consent, and you should not keep data longer than needed. Many firms delete bills 6 to 12 months after a lost opportunity, per their own retention policy.
How long does the project take?
Around 10 to 14 weeks. Gathering yield data and drone photos for 15 to 30 projects often takes 2 to 3 weeks.
Should we name clients on the project map?
Only with written approval. Showing sector, district and size, for example logistics, Tuas, 620 kWp, works fine without a name.
Let's scope your project. Share your installed capacity, calculator ambitions and target audiences, and we will return an SGD or EUR budget with a launch plan. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.
Mohamed Bah
Fondateur, Kolonell
Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.